This project consisted of:
- 829 pounds of permanent seeding.
- Installed steel benches, trash receptacles and concrete planters.
- Prepared 179 cubic yards of linear planting pits with topsoil.
- Slope stabilization and outlet protection.
- Installed a combination of 12,022 plants, trees, shrubs, and bulbs that were scheduled for the beautification of the project.
|
|
 |
Ditch and outlet protection  |
| |